2.1a. Modul Handbook of B.Eng Civil Engineering
Modul name |
Soil Mechanics Part 1 |
||||||||||
Level module |
6 (undergraduate) |
||||||||||
Abbreviation of applicable |
SIP616201 |
||||||||||
Sub-heading, if applicable |
|
||||||||||
Courses included in the module, if applicable |
|
||||||||||
Semester |
III |
||||||||||
Person in charge |
Prof. Dr. Ir. Lusmeilia Afriani, DEA., IPM |
||||||||||
Lecturer |
1. Ir. Andius D. Putra, ST., MT., PhD., IPM 2. Ir. Iswan, S.T., M.T 3. Ir. Aminuddin Syah, S.T., M.Eng. |
||||||||||
Language |
Bahasa Indonesia, English |
||||||||||
Classifications within the curriculum |
Compulsory/ |
||||||||||
Teaching (hours per week during the semester |
3 (2-1) class hour lecture (2´170 minutes lecture) ´ 16 weeks and (1´170 minutes laboratory practice) ´ 16 weeks |
||||||||||
Workload per semester |
1. The 340 minutes lecture is divided into 120 minutes face to face interaction, 120 minutes structural activities and 120 minutes independent study 2. The 170 minutes laboratory practice |
||||||||||
Credit points |
3 SKS (4.68 ECTS) |
||||||||||
Learning goals/competencies |
C01 |
Capable to analyse index of soil properties, type and soil classification under USCS and AASHTO regulation, compaction and effective stress on soil, and the process of seepage and consequences (7a) |
|||||||||
A02 |
Fulfilling task with moral, ethics and manner (2-S) |
||||||||||
A03 |
Capable to be part of the teamwork and showing social awareness (4a-S) |
||||||||||
A04 |
Being eager to be independent (4b-S) |
||||||||||
P05 |
Mastering tools and software, collecting information, and applicable procedure that has been determined (7b) |
||||||||||
C06 |
Capable to fulfil task as technician, analyst, and engineer with an accurate approach, emphasizing on infrastructure collapse patterns that are adaptive to climate change and loading patterns. (8-S) |
||||||||||
C07 |
Knowledgeable and skilful to fulfil the requirements of applicable standard incorporating factual and specific expertise emphasizing on infrastructure collapse patterns that are adaptive to climate change and loading patterns; hence having competencies to complete task properly and thoroughly (9-S). |
||||||||||
A08 |
Responsible and enable to fulfil task holistically (10-S) |
||||||||||
A09 |
Have a willingness to learn throughout lifetime (11-S) |
||||||||||
Note: C: cognitive; A: affective; P: psychomotor |
|||||||||||
Content |
A. Lecturing 1. Index of soil properties 2. Atterberg Limit (Consistency limit) 3. Soil classification under USCS and AASHTO regulation 4. Soil Compaction and Effective stress 5. Soil permeability 6. Seepage and its consequences 7. Piping problems |
||||||||||
B. Practical work Practical work at the Soil Mechanic Laboratory, University of Lampung
|
|||||||||||
Study/ exam achievement |
Assessment Aspect (%) |
C1 |
A2 |
A3 |
A4 |
P5 |
C6 |
C7 |
A8 |
A9 |
|
Mid test (25%)- written test |
Ö |
Ö |
Ö |
Ö |
|
Ö |
Ö |
Ö |
Ö |
||
Final test (25%)- written test |
Ö |
Ö |
Ö |
Ö |
|
Ö |
Ö |
Ö |
Ö |
||
Quiz 1 (15%) |
Ö |
Ö |
Ö |
Ö |
|
Ö |
Ö |
Ö |
Ö |
||
Quiz 2 (15%) |
Ö |
Ö |
Ö |
Ö |
|
Ö |
Ö |
Ö |
Ö |
||
Final task (20%) |
|
|
|
|
Ö |
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
||
Score index |
|||||||||||
A |
A ³76 |
||||||||||
B+ |
71 £ B+ < 76 |
||||||||||
B |
66 £ B < 71 |
||||||||||
C+ |
61 £ C+< 66 |
||||||||||
C |
56 £ C < 61 |
||||||||||
D |
50 £ D < 56 |
||||||||||
E |
E < 50 |
||||||||||
Forms of media |
Software |
Hardware |
|||||||||
Ms. Office (PPT, Ms Word, Ms. Excel) |
Projektor |
||||||||||
SAP |
LCD |
||||||||||
|
Laptop, computer |
||||||||||